Oracle, PL-SQL, SQL
Novartis AG, Basel
PROJECT LINK: Not available
People in the PROJECT: Stefan Troehler
PROJECT Duration: 13 months
PROJECT Value: SFR. 00'000.00
People in the PROJECT: Stefan Troehler
PROJECT Duration: 13 months
PROJECT Value: SFR. 00'000.00
0
HOURS REQUIRED
0
CUP OF COFFEE
0
LINES IN THE CODE
0
EXPERTS IN THE PROJECT
Creation of a Microsoft Access application, which gets its data from an Oracle database, calculates the life cycles of the individual Novartis Pharma products and supplements or refines existing data. The data is then exported to reports that are implemented in Microsoft Excel. The application is implemented using Oracle and PL SQL as well as SQL, Microsoft Access and VBA as well as SQL and Microsoft Excel and VBA. The end product is the finished reports on the life cycles of the individual Novartis Pharma products.
- Analysis of the existing application.
- Requirement Engineering.
- Create a data model using Dezign.
- Realized using Oracle, Microsoft Access and Microsoft Excel.
- Data from Oracle linked into a Microsoft Access database (Views).
- Creation of queries (SQL) for data transfer using ODBC.
- Programming the wizards for creating the reports.
- Wizards (VBA) control the filtering, refining and sorting of the data.
- Export of the data (entire table) to Excel.
- Calculation and creation of the graphic representation (VBA).
- Testing and documentation (user and technical).
Stefan Tröhler
Oracle DB Developer - Oracle, PL-SQL
11 Jul08:06:27 PM
Oracle DB Developer - Oracle, PL-SQL
04 Jul08:06:27 PM
Oracle, Hyprion Essbase – PL-SQL, SQL, Oracle
09 Mar07:06:27 PM
Lifecycle–Management – Oracle PL-SQL, SQL
29 Sep08:06:27 PM
Laboratory data acquisition - Oracle, Microsoft SQL Server, T-SQL
19 Sep08:06:27 PM
Customer evaluation - Oracle, PL-SQL, SQL
09 Apr08:06:27 PM